少妇bbb搡bbbb搡bbbb,91人妻人人澡人人爽人人精品,中文字幕日韩精品无码内射,丁香婷婷色五月激情综合深爱,看亚洲A级一级毛片,亚洲AV片
Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

National Advisory Service Hotline

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Industry news

Installation process of automobile mold machine

Source: Time:2024-02-03 09:24:42 views:

The installation process of automobile mold machine mainly includes the following steps: 1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the safety requirements

The installation process of automobile mold machine mainly includes the following steps:

1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the installation requirements.

2. Equipment handling: The handling equipment used transports the equipment from the factory to the installation site.

3. Equipment installation: Install the equipment according to the equipment installation drawings, including steps such as positioning, fixing, and connecting the equipment.

4. Equipment debugging: Debug the equipment to ensure that it can operate normally.

5. Equipment acceptance: The equipment supplier and user jointly conduct equipment acceptance to confirm that the equipment meets installation requirements and can operate normally.

6. Training: Provide training to users on equipment operation and maintenance to ensure that they can use and maintain the equipment correctly.

The above are the main steps of the installation process for automotive mold machines, and each step needs to be strictly carried out according to the requirements to ensure that the equipment can operate normally.

keys: 
少妇bbb搡bbbb搡bbbb,91人妻人人澡人人爽人人精品,中文字幕日韩精品无码内射,丁香婷婷色五月激情综合深爱,看亚洲A级一级毛片,亚洲AV片