少妇bbb搡bbbb搡bbbb,91人妻人人澡人人爽人人精品,中文字幕日韩精品无码内射,丁香婷婷色五月激情综合深爱,看亚洲A级一级毛片,亚洲AV片
Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

National Advisory Service Hotline

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Company news

The correct method for grounding laser cutting machines

Source: Time:2019-09-10 15:00:55 views:

Laser cutting machines require strong power to ensure stability during operation. Due to the high voltage connection, the grounding wire is an important part of the usage process, but it is often easily overlooked. Poor grounding may lead to leakage and pose a personal safety hazard. So how about grounding work?
Be prepared before grounding:
The grounding device must be 2-4X 1500 mmX 35 degrees. It should be 1 meter away from any damp place around the house. Then use it three times; Every time a 30mm flat iron guide rail is used to excavate the joint, a good grounding network is formed.
When the local surface connection is completed, the grounding resistance is measured by an instrument. The standard resistance is 3 to 5 ohms.
3. Display. After measuring the resistance, connect one end of the rvv2.5mm2 copper core wire to the lead end of the grounding grid and directly insert it into the grounding hole of the socket used in the laser cutting machine.
  Installation steps:
Firstly, find a damp place at home, dig a soil surface of 1.5 square meters * 300 millimeters, and then use a 2 x 30 millimeter flat iron to weld or connect a 7 millimeter hole, making the ground 1.8 meters high, A clean graveyard of soil& nbsp;
2. Use measuring instruments to measure the grounding resistance of the measurement network.
3. Drill an 8mm hole at the top of the iron, drill it around the hole, and then apply a layer of pituitary gland to tighten the metal wire and flat iron.
4. Guide the wires into the user's trunking and add a safety grounding wire to the grid.
keys: 
少妇bbb搡bbbb搡bbbb,91人妻人人澡人人爽人人精品,中文字幕日韩精品无码内射,丁香婷婷色五月激情综合深爱,看亚洲A级一级毛片,亚洲AV片